November 2003
through March 2004
Following
are photos from the ground-breaking ceremony on Tuesday, November 25, 2003.
| |
|
|
| James
P. Nagy, President/CEO |
A crowd braves the cold. |
State Senator Brian Lees and State Representative
Gale Candaras. | | |
|
|
| Breaking
ground. | The
public unveiling of ValleyStone Credit Union®. |
Directors and staff with the construction
site sign. | As of January
26, the elevator pit had been installed.
| |
|
| |
The elevator pit. |
The elevator pit. |
|
As of February 2nd, the mud slab was poured.
| |
|
| |
The mud slab. |
The mud slab. |
|
As of March 12th, the concrete walls had been poured and and
the structural steel was starting to go up.
| |
|
| |
The concrete walls are poured. |
Starting the steel. |
|
A late season snowstorm didn't halt progress the
week of March 15th, as the second story structural steel was put in place.
| |
|
| |
Second story steel. |
Second story steel. |
|
The week of March 22nd resulted in the installation
of the stairs and vault as well as the pouring of the concrete floors.
| |
|
|
| The
stairs go in. You can also see the steel pan in which the concrete floors were
poured. | Here
you can see the stairs and the vault on the left. |
The concrete floors are poured. |