July through August 2004

The brick work was completed the week of June 28th.

The brick is completed.
This photo shows the detailing above the windows and on the corners.

Throughout the week of July 4th the entrance roof was framed and sheetrock started going up.

The entry roof is framed.
The sheetrock is being hung.
More sheetrock.

The second week of July saw much progress in the interior.

The air handling equipment is in place.
The electrical panels are ready to go.

The first few weeks of August brought about some striking cosmetic changes.

The first coat of blacktop is down in the parking lot and the concrete curbing is installed.
Just inside the front door is the vestibule. See the permanent doors in place as well as the millwork.

Here you can see the carpeting being installed in the lower level.
This is a closer look at the carpeting. We'll get a better shot of it later.
This one shows the ceiling grid on the ground level. The lights are being installed before the ceiling tiles.
This shows installation of the lights in the ceiling.

In the end of August, our progress continued.

This shows an additional angle of the curbing in the parking lot. It is now completed.

The sidewalk near the street is also now installed, as you can see here.

This shows early construction of the teller line.
Here you can see the ceiling in the lobby area.
This one shows the ceiling in the vestibule. In the background you can see interior windows into an office.


 

 


Federally insured by NCUA

 

Privacy Policy | Legal Disclaimer
About Us | Rates | Calculators | Loans | Savings & Checking | Online Anytime
Other Services | News | FAQ | Locations & Hours | Join ValleyStone Credit Union®
Contact Us