The brick work was completed the week
of June 28th.
|
|
|
|
|
The brick is completed.
|
This photo shows the detailing
above the windows and on the corners.
|
|
Throughout the week of July 4th the
entrance roof was framed and sheetrock started going up.
|
|
|
|
|
The entry roof is framed.
|
The sheetrock is being hung.
|
More sheetrock.
|
The second week of July saw much progress in the
interior.
|
|
|
|
|
The air handling equipment
is in place.
|
The electrical panels are
ready to go.
|
|
The first few weeks of August brought
about some striking cosmetic changes.
|
|
|
|
|
The first coat of blacktop
is down in the parking lot and the concrete curbing is installed.
|
Just inside the front door
is the vestibule. See the permanent doors in place as well
as the millwork.
|
Here you can see the carpeting
being installed in the lower level.
|
|
|
|
|
|
This is a closer look at
the carpeting. We'll get a better shot of it later.
|
This one shows the ceiling
grid on the ground level. The lights are being installed before
the ceiling tiles.
|
This shows installation of
the lights in the ceiling.
|
In the end of August, our progress continued.
|
|
|
|
This shows an additional angle of the curbing
in the parking lot. It is now completed.
|
The sidewalk near the street
is also now installed, as you can see here.
|
This shows early construction
of the teller line.
|
|
|
|
|
|
Here you can see the ceiling
in the lobby area.
|
This one shows the ceiling
in the vestibule. In the background you can see interior windows
into an office.
|
|