We have completed the construction
of our new headquarters at 2002 Boston Road in Wilbraham, across
from The Home Depot. It's been a fun project, and we are thrilled
with the results. We are planning a public grand opening the week
of December 13th.
|
|
|
|
|
Here are a few shots of the
finished exterior front.
|
Through the week of September 20th
we got closer to construction completion.
|
|
|
|
|
The landscaping is now planted
and the pavement trucks have arrived in this photo.
|
The pavement of the drivethru
was painstakingly completed.
|
This one also shows paving
the drivethru. It is complicated because they can't use the
big roller under the roof. That has to be done by a small,
hand operated machine.
|
|
|
|
|
|
This shows the installation
of the carpet in the lobby.
|
These are some of the member service representative
work spaces.
|
|
In the week of September 13th, many
of the finishing details were prepared or put in place.
|
|
|
|
The landscaping materials have been delivered
and are ready to be planted.
|
The three dormers on the
roof are air intake louvres, and are now completed.
|
This shows a completed hallway.
You can see the fire detection equipment ready to go.
|
|
|
|
|
|
Here you can see the soffit
above the check desk.
|
This shows a couple of the
worker's cubes.
|
|
In the first two weeks of September,
the landscaping areas were prepared, the exterior electrical work
was hooked up and the interior finish work progressed.
|
|
|
|
This shows the nice detailing of the interior
millwork. The trim is now installed and painted.
|
The fabricated corain part
of the teller line is checked for proper dimensions.
|
Power is connected, so the
exterior lights are now functional.
|
|
|
|
|
|
See the prepared planting
bed on the left of this photo. You can also see the sidewalks
installed.
|
You can see another planting
bed ready to go on the left of this photo.
|
|